ecosystem design in progress methodology

From Specification to Build Requirements

Once the three subsystems were scoped, each needed its own logical, technical, and economic process design before anyone could build it — production, reputation, and monetization, taken one at a time.

Continues from From Business Case to System Specification , where the engagement was scoped and segmented into three subsystems. This page covers what came next: turning that specification into build requirements.

Phase

Build Requirements

Once the subsystems were scoped, the next step was designing the logical, technical, and economic process for each — specifying how the application needed to be built for a user to actually interact with it. That process design is what the subsystem-specific write-ups below build on.

Production

See Shared Ownership of Creative IP for where this landed.

Reputation

See Attributing Contribution and Reputation as a Measurement Layer for where this landed.