Continues from From Business Case to System Specification , where the engagement was scoped and segmented into three subsystems. This page covers what came next: turning that specification into build requirements.
Phase
Build Requirements
Once the subsystems were scoped, the next step was designing the logical, technical, and economic process for each — specifying how the application needed to be built for a user to actually interact with it. That process design is what the subsystem-specific write-ups below build on.
Production
See Shared Ownership of Creative IP for where this landed.
Reputation
See Attributing Contribution and Reputation as a Measurement Layer for where this landed.